TOWN OF BLOWING ROCK, NORTH CAROLINA

2007 SYSTEM PERFORMANCE ANNUAL REPORT

Collection System and Wastewater Treatment Plant

 

This report provides performance information on the Town of Blowing Rock sewer collection system and wastewater treatment plant in the year 2007.  It is required under the provisions of the Clean Water Act of 1999, House Bill 1160 ratified on July 20, 1999.

 

COLLECTION SYSTEM

 

I.                  General Information

 

Facility Name:              Town of Blowing Rock

            Responsible Entity:        Town of Blowing Rock

            Person in Charge:         Johnny K. Lentz, Collection System ORC

            Applicable Permits:       WQCS00142

 

II.               System Description

 

The collection system consists of approximately 15.5 miles of gravity sewer lines and 2.5 miles of pressure sewer.  There are three lift-stations; Mayview, Chetola, and Chestnut Hill which are checked daily. 

 

III.           Performance

 

Four spills that reached surface waters occurred in the collection system during the year.  In accordance with State regulations, all were reported to the State of North Carolina, Department of Environment and Natural Resources.  The table below gives the spill volume and the date it occurred.

 

Location                                         Month                         Volume (gal)

         

            Manhole 200 feet south of                    01/01/07                                  1,000

            Sunset Drive on Ransom Street

 

            14 feet south of #4 Tee box                  05/22/07                                  1,000                          

manhole at BR Country Club       

 

            100 feet south of residence                   06/20/07                                  1,000

            340 Country Club Lane

 

            Influent manhole into                             12/01/07                                  5,300

            Mayview Lift Station                

 

           

 

 

BLOWING ROCK WASTEWATER TREATMENT PLANT

 

I.                  General Information

 

Facility Name:              Town of Blowing Rock Wastewater Treatment Plant

            Responsible Entity:        Town of Blowing Rock

            Person in Charge:         Thomas  McRary, Wastewater Treatment Plant Manager

            Applicable Permits:       NPDES Permit No:  NC0027286       

 

II.               System Description

 

Wastewater is physically screened through two sets of bar racks and then enters the equilization basin.  It is then pumped by three influent pumps to four aeration basins where diffused air is added by five blowers.  It then enters two clarifiers where a part of the sludge is returned to the head of the plant.  The clear water on top of the clarifiers then enters the chlorine contact chamber where chlorine is fed to kill the bacteria. De-chlorine chemical is then added to take the chlorine out of the water before entering the river.  

 

Solids are wasted to the digester daily.  Honeywell Septic Tank Service hauls sludge to Lenoir WWTP for disposal.  

 

I.                  Performance

 

Plant Capacity:  .800 MGD

            

Average Daily Flow for 2007

 

Month

Average Daily

Maximum Flow

Minimum Flow

January

.390

           1.005

.153

February

.187

.342

.108

March

.217

.628

.104

April

.201

.279

.115

May

.195

.286

.132

June

.215

.369

.119

July

             .284

.533

.192

August

.263

.572

.132

September

.216

.352

.130

October

.253

.524

.157

November

.211

.352

.105

December

.198

.348

.092

 

The plant treated 86.326 MG of wastewater in 2007.  The plant was in violation in January due to excessive rainfall.  The flow exceeded .8 MGD on 1 day.  No other violations were reported in 2007.

 

2007 Results For Permit NPDES Parameters

 

Parameter

Limit
Violations

PH

6-9 Units

0

BOD

30-45 ppm

0

Total Suspended Solids

30-45 ppm

0

Ammonia Nitrogen

No Limit

0

Dissolved Oxygen

>5.0 ppm

0

Fecal Coliform

200-400 ppm

0

Conductivity

No Limit

0

Flow

.8 MGD

1 day (01/01/07)

Chronic Toxicity

Pass/Fail

0

Chlorine

28 ug/l

0

 

II.                Notification

 

This report is available online at the website www.townofblowingrock.com for the Town of Blowing Rock.  In addition copies are available for review at the Town Hall Office at 1036 Main Street, Blowing Rock, NC.

 

III.             Certification

 

            I certify under penalty of law that this report is complete and accurate to the best of my knowledge.  I further certify that this report has been made available to the users or customers of the named system and that those users have been notified of its availability.

 

__________________________                                ________________

Thomas McRary                                                                    Date

Water and Wastewater Treatment Plant Manager

 

__________________________                                ________________

Johnny Lentz                                                                          Date

Collection System ORC